Skip to main content

WebRequests to the configured external xml source are not permitted (Medium trust)

I have setup a YouTube XML channel list on my DotNetNuke website and all was working good on the staging site as it was in full trust but production being a shared hosting has a medium trust and now the IFrame and XSL rewrite script and all are useless as the web service to pull the XML from YouTube itself is failing because of the medium trust issue.

Request for the permission of type 'System.Net.WebPermission, System, Version=2.0.0.0, Culture=neutral, PublicKeyToken=b77a5c561934e089' failed.


WebRequests to the configured external xml source are not permitted (Medium trust)

Anyone has any additional update on how to fix this? without the need of compiling the entire DotNetNuke source code?

Thanks,
Wasay

I looked up these references:


Comments

Popular posts from this blog

Completed UiPath - RPA Developer Advance Training

After a month of training, with late nights and weekends I have completed the UiPath RPA Developer Advance Training.

The Level 1 Foundation Training pretty much covered all the basics of Desktop studio and workflows, only draw back was I started with the default foundation course which was for 2016, and all document reference links where pointing to 2016 version. I didn't understand it during the foundation training and kept switching to 2018 version document/page.

Only after completing the Foundation course that I realized, I was suppose to have started with the 2018 version of Level 1 Foundation Training, but as it was optional I didn't have to retake the 2018 version, the 2016 was good enough for moving to level 2.

The Level 2 Orchestrator 2018.3 Training as good. It gave good understanding of Queue's, Jobs, and schedules and I was able to complete the level two much faster then the level 1.

The Level 3 UiPath Advanced Training was bit tough as it involved the assignme…

Working hours in six months to a year

I usually try to look for how many hours I have worked on a given project and what hours that I  spend on learning or network management tasks.

Below I have added some hours calculation, after finding the breakdown by months from Berkeley website.


Credit: http://controller.berkeley.edu/payroll/payroll-system-pps/pps-training-materials/number-working-hours-month

2017Working hours six months (Jan 1st - Jun 30th): 
130 days x 8 hours =  1040 hours


Working hours six months (Jul 1st - Dec 31th): 
130 days x 8 hours =  1040 hours

Working hours for the year:
1040 hours + 1040 hours = 2080 hours
MonthWorking Days in the monthMonthly Working Hrs1/2 of working hrsMidpoint of working days in the monthDates of HolidaysJanuary22176888 a.m. 1/172,16February20160808 a.m. 2/1520March2318492Noon 3/1631April20160808 a.m. 4/17May2318492Noon 5/1629June22176888 a.m. 6/16July2116884Noon 7/174August2318492Noon 8/16September2116884Noon 9/154October22176888 a.m. 10/17November22176888 a.m. 11/1610,23,24December21168…